South Carolina Bids > Bid Detail

23-P029R Low Battery Seawall Rehabilitation Project Phase IV

Agency: Charleston
Level of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Opps ID: NBD14987211529444427
Posted Date: Aug 29, 2023
Due Date: Sep 5, 2023
Solicitation No: 23-P029R
Source: https://www.charleston-sc.gov/...
Bid Number: 23-P029R
Bid Title: 23-P029R Low Battery Seawall Rehabilitation Project Phase IV
Category: Procurement Bids
Status: Open

Description:

There will be a Non-Mandatory Pre-Proposal Meeting at 2:00pm on August 9, 2023 at 75 Calhoun Street, 3rd Floor in the HR Training Room. If you park in the Gaillard Garage, the crosswalk on level 4 of the garage will lead you to the building (3rd floor).

Questions are to be submitted in writing no later than 3:00pm on August 16, 2023 to robinsonr@charleston-sc.gov

For security reasons, you must enable JavaScript to view this E-mail address. .

The City of Charleston is seeking the services of a qualified Contractor for a Construction Manager At-Risk (CMAR) contract for the Low Battery Seawall Rehabilitation Project – Phase IV. Engineering and Design Services for the Project will be performed by Johnson, Mirmiran and Thompson (JMT). The CMAR Contractor will collaborate with the Design Team during the Pre-Construction Phase to facilitate constructability, cost control, scope management, temporary works planning and design, and other project elements as fully described in the scope of services. Construction of Phase III is currently underway and is scheduled to be completed in October 2023. Phase IV of the Low Battery Restoration Project extends along Murray Boulevard and East Battery Street, between the end of Phase III and the intersection of South Battery Street in the City of Charleston, SC. In conjunction with the rehabilitation of the wall, the existing roadway and storm drainage system will be also replaced. An investigation and repair procedure will also be included for the High Battery Seawall from the Turn to South Battery. The CMAR Contractor will collaborate with the Design Team throughout the Pre-Construction Phase and provide input to the design pertaining to constructability, means and methods, sequencing, temporary works, cost and schedule to prepare for successful execution of the construction of this Project. The Design Team and the CMAR Contractor will prepare final, coordinated Construction Documents that detail the proposed Project. The Contractor should have the ability to meet Minority & Women-Owned Business Enterprise (MWBE) criteria established by the City.

Publication Date/Time:
7/28/2023 9:00 PM
Closing Date/Time:
9/5/2023 1:00 PM
Pre-bid Meeting:
8/9/2023 @ 2:00pm
Contact Person:
Robin B. Robinson
843-724-7314
robinsonr@charleston-sc.gov
Fee:
N/A
Business Hours:
8:00am - 5:00pm
Fax Number:
843-720-3872
Plan Holders List:
N/A
Related Documents:

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >